Sattva Engineering Construction IPO is a book build issue of ₹35.38 crores. The issue is entirely a fresh issue of 0.47 crore shares of ₹35.38 crore.
Sattva Engineering Construction IPO bidding started from Aug 26, 2025 and ended on Aug 29, 2025. The allotment for Sattva Engineering Construction IPO was finalized on Sep 1, 2025. The shares got listed on NSE SME on Sep 3, 2025.
Sattva Engineering Construction IPO price band is set at ₹75.00 per share . The lot size for an application is 1,600. The minimum amount of investment required by an individual investor (retail) is ₹2,40,000.00 (3,200 shares) (based on upper price). The minimum lot size investment for HNI is 3 lots (4,800 shares), amounting to ₹3,60,000.
Vivro Financial Services Pvt.Ltd. is the book running lead manager and MUFG Intime India Pvt.Ltd. is the registrar of the issue. The market maker of the company is Rikhav Securities Ltd..
Refer to Sattva Engineering Construction IPO RHP for detailed Information.
IPO Date | August 26, 2025 to August 29, 2025 |
Listing Date | September 3, 2025 |
Face Value | ₹10 per share |
Issue Price Band | ₹70 to ₹75 per share |
Issue Price Final | ₹75 per share |
Lot Size | 1,600 Shares |
Sale Type | Fresh Capital |
Total Issue Size | 47,16,800 shares (aggregating up to ₹35.38 Cr) |
Reserved for Market Maker | 2,40,000 shares Rikhav Securities Ltd. (aggregating up to ₹1.80 Cr) |
Net Offered to Public | 44,76,800 shares (aggregating up to ₹33.58 Cr) |
Issue Type | Bookbuilding IPO |
Listing At | NSE SME |
Share Holding Pre Issue | 1,27,51,816 shares |
Share Holding Post Issue | 1,74,68,616 shares |
Sattva Engineering Construction IPO offers total 47,16,800 shares. Out of which 22,17,600 (47.01%) allocated to QIB, 8,88,000 (18.83%) allocated to QIB (Ex- Anchor), 6,91,200 (14.65%) allocated to NII, 15,68,000 (33.24%) allocated to RII and 13,29,600 (28.19%) allocated to Anchor investors.
Investor Category | Shares Offered |
---|---|
Market Maker Shares Offered | 2,40,000 (5.09%) |
QIB Shares Offered | 22,17,600 (47.01%) |
− Anchor Investor Shares Offered | 13,29,600 (28.19%) |
− QIB (Ex. Anchor) Shares Offered | 8,88,000 (18.83%) |
NII (HNI) Shares Offered | 6,91,200 (14.65%) |
− bNII > ₹10L | 4,60,800 (9.77%) |
− sNII < ₹10L | 2,30,400 (4.88%) |
Retail Shares Offered | 15,68,000 (33.24%) |
Total Shares Offered | 47,16,800 (100.00%) |
Sattva Engineering Construction IPO raises ₹9.97 crore from anchor investors. Sattva Engineering Construction IPO Anchor bid date is August 25, 2025. Sattva Engineering Construction IPO Anchor Investors list
Bid Date | August 25, 2025 |
Shares Offered | 13,29,600 |
Anchor Portion Size (In Cr.) | 9.97 |
Anchor lock-in period end date for 50% shares (30 Days) | October 1, 2025 |
Anchor lock-in period end date for remaining shares (90 Days) | November 30, 2025 |
Sattva Engineering Construction IPO opens on August 26, 2025, and closes on August 29, 2025.
IPO Open Date | Tue, Aug 26, 2025 |
IPO Close Date | Fri, Aug 29, 2025 |
Tentative Allotment | Mon, Sep 1, 2025 |
Initiation of Refunds | Tue, Sep 2, 2025 |
Credit of Shares to Demat | Tue, Sep 2, 2025 |
Tentative Listing Date | Wed, Sep 3, 2025 |
Cut-off time for UPI mandate confirmation | 5 PM on Fri, Aug 29, 2025 |
Investors can bid for a minimum of 3,200 shares and in multiples of 1,600 shares thereof. The following table depicts the minimum and maximum investment by Individual Investors (Retail) and HNI in terms of shares and amount.
Application | Lots | Shares | Amount |
---|---|---|---|
Individual investors (Retail) (Min) | 2 | 3,200 | ₹2,40,000 |
Individual investors (Retail) (Min) | 2 | 3,200 | ₹2,40,000 |
S-HNI (Min) | 3 | 4,800 | ₹3,60,000 |
S-HNI (Max) | 8 | 12,800 | ₹9,60,000 |
B-HNI (Min) | 9 | 14,400 | ₹10,80,000 |
Note : The value will be calculated using Equity Dilution = Share Holding Pre Issue - Share Holding Post Issue
Incorporated in December 2005, Sattva Engineering Construction Limited is a Chennai-based Engineering, Procurement, and Construction (EPC) company specializing in water infrastructure, wastewater management, and industrial construction projects.
With over 40 years of experience, SECL is a leading Class I contractor collaborating with government bodies like the Tamil Nadu Public Works Department and Chennai Metropolitan Water Supply and Sewerage Board.
SECL offers comprehensive EPC solutions across several sectors:
Notable clients include CMWSSB, TWAD, PWD, Greater Chennai Corporation, Southern Railway, and BHEL
Competitive Strength:
Sattva Engineering Construction Ltd.'s revenue increased by 22% and profit after tax (PAT) rose by 100% between the financial year ending with March 31, 2025 and March 31, 2024.
Period Ended | 31 Mar 2025 | 31 Mar 2024 | 31 Mar 2023 |
Assets | 114.82 | 87.48 | 83.38 |
Total Income | 94.85 | 77.44 | 83.93 |
Profit After Tax | 9.14 | 4.56 | 1.04 |
EBITDA | 18.56 | 11.72 | 7.28 |
Net Worth | 43.42 | 24.03 | 19.47 |
Reserves and Surplus | 30.67 | 23.03 | 18.47 |
Total Borrowing | 36.17 | 32.20 | 32.24 |
Amount in ₹ Crore |
The market capitalization of Sattva Engineering Construction IPO is ₹131.01 Cr.
KPI as of Mon, Mar 31, 2025.
KPI | Values |
---|---|
ROE | 27.10% |
ROCE | 28.58% |
Debt/Equity | 0.83 |
RoNW | 27.10% |
PAT Margin | 9.64% |
EBITDA Margin | 19.82% |
Price to Book Value | 2.20 |
Pre IPO | Post IPO | |
---|---|---|
EPS Rs | 7.17 | 5.23 |
P/E (x) | 10.46 | 14.34 |
The Company Sattva Engineering Construction IPO proposes to utilise the Net Proceeds from the Issue towards the following objects:
S.No. | Objects of the Issue | Expected Amount (₹ in crores) |
---|---|---|
1 | To meet long-term working capital requirements | 27.50 |
2 | General Corporate Purposes |
[Dilip Davda] SECL is engaged in providing water resource management solutions. It posted growth in its top and bottom lines for the reported periods. The company has orders on hand worth Rs. 308+ cr. as of March 31, 2025. Based on its recent financial data, the issue appears fully priced. Well-informed investors may park funds for long term. Read detail review...
Listing Date | September 3, 2025 |
BSE Script Code | |
NSE Symbol | SATTVAENGG |
ISIN | INE14DW01018 |
Final Issue Price | ₹75 per share |
NSE Listing Group | ST |
Price Details | NSE SME |
---|---|
Final Issue Price | ₹75.00 |
Open | ₹95.10 |
Low | ₹95.10 |
High | ₹99.85 |
Last Trade | ₹99.85 |
Sattva Engineering Construction Ltd.
Greams Dugar, 4th floor, North Wing,
Old No. 149, New No . 64,
Greams Road Thousand Lights
Chennai, Tamil Nadu, 600006
Phone: +91-80 1555 6979
Email: investor.relation@sattvaengg.in
Website: https://sattvaengg.in/
MUFG Intime India Pvt.Ltd.
Phone: +91-22-4918 6270
Email: sattvaengineering.smeipo@in.mpms.mufg.com
Website: https://linkintime.co.in/Initial_Offer/public-issues.html
Sattva Engineering Construction IPO is a SME IPO of 47,16,800 equity shares of the face value of ₹10 aggregating up to ₹35.38 Crores. The issue is priced at ₹75 per share. The minimum order quantity is 1600.
The IPO opens on August 26, 2025, and closes on August 29, 2025.
MUFG Intime India Pvt.Ltd. is the registrar for the IPO. The shares are proposed to be listed on NSE SME.
Zerodha customers can apply online in Sattva Engineering Construction IPO using UPI as a payment gateway. Zerodha customers can apply in Sattva Engineering Construction IPO by login into Zerodha Console (back office) and submitting an IPO application form.
Steps to apply in Sattva Engineering Construction IPO through Zerodha
Visit Zerodha IPO Application Process Review for more detail.
The Sattva Engineering Construction IPO opens on August 26, 2025 and closes on August 29, 2025.
Sattva Engineering Construction IPO lot size is 1600, and the minimum amount required for application is ₹2,40,000, with 2 lots being the minimum application size.
You can apply in Sattva Engineering Construction IPO online using either UPI or ASBA as a payment method. ASBA IPO application is available in the net banking of your bank account. UPI IPO Application is offered by brokers who don't offer banking services. Read more detail about applying IPO online through Zerodha, Upstox, 5Paisa, Nuvama, HDFC Bank, and SBI Bank.
The finalization of Basis of Allotment for Sattva Engineering Construction IPO will be done on Monday, September 1, 2025, and the allotted shares will be credited to your demat account by Tuesday, September 2, 2025. Check the Sattva Engineering Construction IPO allotment status.
The Sattva Engineering Construction IPO listing date is on Wednesday, September 3, 2025.
Useful Articles